Saturday, April 16, 2011

Saturday, 4-16-11 work day

Diana and Judy weeded bed E2 and hand watered the Garden. Afterward they and Bruce assembled 28- T-Tape manifold components consisting of (tubing with end blocked with "figure" 8 termination, 3- regular T-tape couplings, 2- couplings w/valve.) 

The two components assembled Friday and today will be joined on the garden beds (attached at one end to the PVC supply line and at the other end to the T-Tape runs along the length of the beds.

No comments:

Post a Comment