Sunday, January 9, 2011

Compost Bin Construction 1/8/11

Saturday, January 8, 2011 Ron, Mark and Bruce worked on the compost bins, placed them in a location between the fence and the compostable materials piles. Bin structure and wire cloth  is basically completed and door slats were started. Goal is to have the bins ready for building the first compost piles Wednesday, 1/12/11.

1 comment:

  1. On January 13 AM, Bruce Completed the door slats for the first three compost bins utilizing some spare 7/16" OSB from an old home project and some used 1 x 4 wood form material from Asbury. The only work left to complete the bins is to make light wood-frame wire net covers to keep rodents/other small mamamals out. Bins will be covered with a plastic tarpalin during heavy rain.

    ReplyDelete